Add a new level to a hierarchy

Add new levels to a hierarchy of a dimension when you need to organize data in the hierarchy more granularly.

Complete the following steps to edit a dimension in a cube.

  1. Log into the Pentaho User Console (PUC).

  2. Open the Semantic Model Editor by taking one of the following actions:

    • If you are using the Modern Design of PUC, in the menu on the left side of the page, click Semantic Model Editor.

    • If you are using the Classic Design of PUC, click File > Semantic Model Editor.

    The Semantic Model Editor opens.

  3. Open the semantic model that contains the cube with a dimension you want to edit by completing the following sub steps:

    1. In the Semantic Models list, navigate to the model you want to open by searching or scrolling through the list.

    2. Click Open. The model opens in the canvas.

  4. On the canvas, locate the cube, dimension node, dimension, hierarchy you want to add the new level to.

    Note: To locate an element in a large semantic model, you can click the Model Structure tab and then navigate to the element by searching or scrolling through the list.

  5. Click any of the More Actions icon available in the respective Dimension structure and select Edit. The Dimension Editor window opens for that dimension.

  6. If not yet selected, select the Hierarchy in the tree. Click Add New Level. A new level is added to the hierarchy with the name “Level” and a number representing the order in which the level was added to the dimension. For example, “Level2” is the second level added to the hierarchy.

  7. Click Apply. Edits to the dimension are applied.

  8. In the Semantic Model Editor, click Save to save changes to the model.

Last updated

Was this helpful?